Does my project require a permit?

The California Building Code requires:

“Any owner or owner's authorized agent who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system, the installation of which is regulated by this code, or to cause any such work to be performed, shall first make application to the building official and obtain the required permit...

Construction or work for which a permit is required shall be subject to inspection by the building official and such construction or work shall remain accessible and exposed for inspection purposes until approved.”

If you have any questions about permits or plan review, please contact us.

Back to Building Department category

What documents do I need to submit for a permit?

Plans, specifications, product submittals, California Energy Code (Title 24 Pt. 6) compliance documentation, and where applicable, a Load Study.

For simple modifications, this might be covered by a scope of work narrative or a simple drawing. Electrical modifications require a single-line diagram.

Back to Building Department category

What is a Load Study, and why do I need one?

Section 220.87 of the California Electrical Code requires that prior to modifying or adding to electrical systems, their existing loads must be determined. The code requires 30 days of data monitoring, but in buildings with stable loads, the Campus Electrical Engineer may reduce this requirement to 7 days.

Load studies are required so that electrical panels do not become overloaded or their loads become unbalanced between phases.

If you have any questions about load studies, please contact us.

Back to Building Department category

My project is all done. Now what do I do?

Submit for a final inspection, both with the Building Department and the Campus Fire Marshal. Once you've corrected any prior deficiencies, and passed a final inspection (or corrected any punchlist items generated during your final inspection) you can start working on your closeout documents:

  • As-Built and/or Record Drawings (Record Drawings if multiple disciplines involved; As-Built Drawings by trade)
  • Operations and Maintenance Manuals
  • Warranties/guarantees
  • California Energy Code (Title 24 Pt. 6) compliance documentation, including
  • Commissioning by certified commissioning agent (lighting/HVAC)
  • Installation certificates completed by installer/contractor guaranteeing fixtures/appliances were installed as outlined in permit documents

You'll receive a Certificate of Occupancy upon the approval of Building Official and Campus Fire Marshal.

Note: projects must submit all required close-out documents before retention can be released or final payment made.

Back to Building Department category

My project is done, but I don't have all the final documentation. Can I move in yet?

If you've passed your final inspections with the Building Department and the Campus Fire Marshal, you may be issued a Temporary Certificate of Occupancy, which allows you to occupy the space, while you work on gathering your closeout documents. Note: retention will not be released nor final payment made until you have received a permanent Certificate of Occupancy.

Back to Building Department category

Does my project require review for accessibility compliance?

Yes. All projects are reviewed for compliance with Chapter 11b - Accessibility to Public Buildings, Public Accommodations, Commercial Buildings and Public Housing.

Generally, large projects are reviewed by the Division of the State Architect. Small projects are reviewed in-house by Certified Access Specialist (CASp) certified plan reviewers.

Back to Building Department category

Why do I need to submit for a permit for carpet and other finishes?

Carpet, drapery, acoustic panels and the like must be reviewed for compliance with the California Fire Code. Additionally, the university is obligated to collect and maintain data regarding these activities to demonstrate compliance with California and University bidding, purchasing and contracting rules.

Back to Building Department category

How do I share documents with the Building Department?

Email is easy! Send your documents as attachments to: building@berkeley.edu. Make sure your email denotes your project details (Permit number if one has been issued, client reference number if not) so we know what the documents pertain to.

If your files are too big for email, you can use either of Berkeley's file sharing tools (Box or Google Drive). Just be sure to allow access to "anyone with the link" in either system before you send along...

Back to Building Department category

I heard I need to submit a permit for painting. Is that true?

When we first instituted the permit process, we did require permits for paint in order to collect data on who was doing such work on campus. We have since changed our business process, and as such, permits for paint are no longer required.

Back to Building Department category

What can go in the Polycarbin bins?

Recycling Protocol Decision Tree – Polycarbin

*Anything being put into Polycarbin should still abide by EH&S guidelines first and foremost

Permitted in Bins:

  • Plastic type 1 (PETE)
  • Items with stickers/labels still attached
  • BSL1 (only recombinant DNA, and must be autoclaved or treated with liquid bleach before recycling. No living organisms, cells, or infectious agents)
  • Rinse bottles that contained U-List chemicals

Prohibited Items:

Ensure all products are drip-dry, and rinse out any powders before disposal.

  • ≥BSL2
  • For plastics that have come in contact with non-infectious yeast or E. coli, please spray the plastics with 70% EtOH or 1% bleach.
  • Soft Packaging (non-rigid plastics, like film)
  • Municipal plastics (eg. food packaging)
  • Fibrous waste (eg. Kimwipes, cardboard, paper)
  • Rubber/Latex/Nitrile/Silicone (eg. tubing, gloves)
  • Metal (eg. cold block, face masks)
  • #7 Plastics (Safety Glasses, Cell Scrapers, Weigh Boats)
  • P-List Chemicals
Back to Building Department category
Back to FAQ list

Menstrual Equity

How can I request a menstrual product dispenser?

There's a campus building I frequently use that is not on the list of planned dispenser locations. How can I request a dispenser for that location?

Please email ucbcustodial@lists.berkeley.edu if there is a campus location you frequently use that is not on the Building Schedule.

Back to Menstrual Equity category

Who do I reach out to if a dispenser needs to be refilled with products?

If a dispenser is out of either pads or tampons, please reach out to the Building Manager for that specific building. The campus custodial team restocks the dispensers regularly, along with the other bathroom products (soap, paper towels, etc).

Back to Menstrual Equity category

What type of product(s) do the dispensers carry?

Dispensers carry both pads and tampons. Simply select the button corresponding to your preference and it will dispense the desired product, free of charge.

Back to Menstrual Equity category

Are the dispensers only for students? What about faculty and staff?

The dispensers are intended to serve the entire campus community. This includes students, faculty, staff, and guests to campus.

Back to Menstrual Equity category

Which specific bathrooms will dispensers be in?

For each building on the Building List, a separate dispenser will be installed in a Women’s, Men’s, and Gender Neutral Bathroom (if one is present in the building). Any menstruator can access the dispensers, regardless of gender identity. Refer to the map to find where these bathrooms are in each building.