UC Berkeley Fire Fuel Management Program

UC Berkeley manages approximately 800 acres in the hills east of campus, an area referred to in the campus 2020 Long Range Development Plan as the “Hill Campus”. 

The most dramatic physical feature of the Hill Campus is Strawberry Canyon, a watershed of roughly one square mile drained by the south fork of Strawberry Creek. This water supply helped convince the trustees of the early College of California to acquire the ranch lands along the creek in 1868 as the site for their new campus. At the time, the hills above the campus were a mix of grassland, oak savannah and open chaparral. It was not until speculators in the next decade planted eucalyptus, in a failed scheme to grow and harvest them for commercial use, that the hills began to acquire their present, largely forested look. 

The mix of scrub and conifer and eucalyptus stands makes the East Bay Hills a regular seasonal fire risk. This risk becomes particularly pronounced during the periodic one- or two-day shifts from the normal northwesterly winds to ‘Diablo’ winds blowing in from the warm, dry regions to the east. 20th century Diablo wind fires have burned over ten times the acreage of normal wind condition fires, and include the firestorms of 1923 and 1991. 

In partnership with other agency members of the Hills Emergency Forum, UC Berkeley maintains an ongoing program of fire fuel management in the Hill Campus to reduce fire risk to the campus, LBNL, neighboring residents, and recreational visitors to adjacent park and watershed lands. While the treatment used in a given area must be customized to address its specific conditions, including vegetation type, access, and proximity to roads and structures, in general the treatments are designed to meet one or more of the following goals:

  • Reducing fuel load by removing dead material, reducing plant density, and favoring species with lower fuel content,
  • Reducing horizontal spread by reducing fine fuel material and by separating dense clusters of vegetation with areas of lower fuel load, and
  • Reducing vertical fire spread by increasing separation of understory and crown fuels.
UC Berkeley has finalized an Addendum to the UC Berkeley 2020 Long Range Development Plan Environmental Impact Report, examining the fire risk reduction work to be undertaken in the Hill Campus.  Click each link to download the associated file:

Notice of Determination approving the project.

As described in the Addendum, the Hill Campus Fire Risk Reduction work has been extensively described and analyzed both in the UC Berkeley 2020 Long Range Development Plan and in an environmental impact statement prepared on behalf of the Federal Emergency Management Agency (FEMA) and approved in 2015 (To see The East Bay Hills EIS for Fire Risk Reduction, click here).
In accordance with CEQA, an addendum need not be circulated for public review.  Nonetheless, a draft of the Addendum was circulated in March 2016.  The final Addendum incorporates responses to comments received.  See Section VIII.

East Bay Hills EIS for Hazardous Fire Risk Reduction

Coordinating with other local agency members of the Hills Emergency Forum, UC Berkeley submitted grant applications to the Federal Emergency Management Agency (FEMA) seeking funding to supplement ongoing fire fuel mitigation activities in 2005 (for Strawberry Canyon, Application Number PDM-PJ-09-CA-2005-011; for Claremont Canyon, Application Number PDM-PJ-09-CA-2005-003).  In 2006, UC Berkeley was also a partner on a grant submittal made by the City of Oakland, expected to address live fuel load on a portion of UC Berkeley property known as Frowning Ridge (Application Number PDM-PJ-09-CA-2006-004).

In early 2015, nine or more years after the grant applications were submitted, FEMA approved the Strawberry and Claremont Canyon projects as outlined in extensive environmental documentation, closely coordinated with regulatory agencies. The Frowning Ridge project was fully analyzed in the EIS but deemed ineligible for funding because some fuel removal work was undertaken by the campus prior to FEMA's determination.

Hazardous Fire Risk Reduction Environmental Impact Statement

Fire Mitigation Committee

The campus has its own Fire Mitigation Committee, chaired by Professor Scott Stephens

UC Berkeley campus, hills beyond, 1901

UC Berkeley campus, hills beyond, 1901

View of East Bay Hills from campus, 1901 (source:  UC Berkeley School of Information Flickr Album of South Hall Historic Photos)

Questions?

Questions about UC Berkeley's fire hazard reduction program and work should be directed to Devin Woolridge at woolridg@berkeley.edu or 510-812-0540.